
Vendor migrations are some of the highest-risk projects in engineering and the ones most often executed badly. The pattern that works is the opposite of the heroic 'big bang cutover' -- it's slow, dual-running, and built on a strangler fig. Here's how to plan and execute one without losing sleep or shipping outages.
Engineering Craft
TypeScript, CI/CD, databases, observability -- the skills that make code production-ready.